Project location:UAE
Product:PIPE FITTINGS & FLANGE
Standard and material:
FITTINGS: ASTM A420 WPL6, ASME B16.9 ,
NACE MR0175 / ISO 15156
FLANGE: ASTM A182 GR F51 ( UNS S31803 ), ASME B16.5,
NACE MR0175 / ISO 15156
Specifications:1” – 8”
Application:Oil Transportation Pipe Fittings
Inquiry time:2022.04.13
Order time:2022.05.13
Shipping time:2022.06.20
Estimated arrival time:2022.07.15
The regular customer we described today is a local contractor in Dubai. This batch of ordered products are used in oil pipeline projects. The end user is Dubai oil company,
which has very strict technical requirements for production of pipe fittings and lists very detailed technical requirements. After receiving the inquiry and relevant documents
from the customer, Xinyue’s technical department carefully analyze each technical requirement. The quotation scheme was submitted to the customer with 100% match
the requirements .
Because this batch of pipe fittings apply to acid corrosion condition, so the acid resistance and corrosion resistance is necessary, each product needs to stand the test of
service life with good quality control. We must control the key points of each production. After the formal signing, Xinyue organizes all departments to hold a pre-production
meeting to analyze and eliminate the possible difficulties in the production process in advance.
Finally, with the full cooperation of all departments of Xinyue, this order was completed on schedule. Because of the efforts made in the early stage, the third-party inspection
was as smooth as ever. All the test data met the needs of customer, and all the goods were shipped to the customer’s destination port at the end of June.