Project location:Singapore
Product:Pipe Fittings and Flange
Standard and material:
20# and 316L
Specifications:
OD–25A to100A
TK–Sch40 to Sch80
Application:Shipyard
Inquiry time:2022.03.15
Order time:2022.05.04
Shipping time:2022.06.28
Arrival time:2022.07.12
The customer of this order is a famous local shipyard company in Indonesia. Who is a new customer to send inquiries through e-commerce.
The destination port of this order is Singapore, which is used for the engineering projects of the customer’s branch company in Singapore.
As it was the first cooperation, the customer proposed to use 100% letter of credit payment term. The two parties signed the contract on May 4th and we received the letter
of credit on May 26th. Although the production time is very tight with a more than 80 sizes complex order need to hand. Xinyue, with years of production experience
and supply strength, completed all production on time, also pass the final inspection with a qualified data according to the contract. Finally, all the goods were delivered
by the container to Tianjin port on June 22nd, and boarded the cargo ship on June 26th, almost a week earlier than the customer’s expected shipping time. Our goods
will arrive at Singapore port on July 12th. Let’s wait for the customer’s feedback after receiving the goods.