Project location:Mongolia
STEEL PIPE, PIPE FITTING, FLANGE, BOLT&NUT, GASKET
Standard and material:ASTM A53 GR B, API 5L GR B
Specifications:Outer Diameter: DN200—DN1600
Length: 12M
Application:Water Purification Plant
Inquiry time:2022.03
Order time:2022.10
Shipping time:2023.02
Estimated arrival time:2023.04
The order took as long as half a year to sign,
and the customer had done in-depth
and detailed investigation and research on Xinyue
at the beginning of the inquiry,
including the examination of various qualifications and certificates,
as well as the understanding of Xinyue’s past cooperation projects,
and witnessed the production strength
and technical ability of the factory through a third party,
which, of course, could not be separated from the hard work
of the foreign trade specialist of the order.
After half a year of unremitting efforts and perseverance,
Xinyue successfully obtained the right to supply this order.
This is a drinking water purification project,
which involves people’s livelihood.
In order to ensure the safety of drinking water,
the fittings must meet the food grade,
so the requirements of the order are extremely strict
and the range of products is also very wide,
including steel pipes, fittings, flanges, bolts and nuts and gaskets,
which basically cover the materials used for the whole project,
and also require a non-toxic and harmless anti-corrosion coating
for all the steel pipes and fittings.
Therefore, after a detailed study of the products in the contract,
the technical department of Xinyue provided the customer
with detailed drawings for reference on the one hand;
on the other hand,
Xinyue took the initiative to submit the WRAS non-toxic certificate
of the anti-corrosion coating to the customer,
demonstrating Xinyue’s professionalism
and enhancing the customer’s trust in Xinyue.
After more than two months,
Xinyue successfully completed the production of
all the products and the coating was meticulously inspected
by a third party company and the data obtained was 100%
in line with the order requirements.
The whole batch was shipped to the project site by rail in February this year.